Rosatom starts pilot operation of a fuel fabrication facility for the BREST-OD-300 fast reactor Rosatom, PUBLISHED 25.12.2024 The unit for fabrication/refabrication pf nuclear fuel for the innovative BREST-OD-300 fast neutron reactor was put into pilot operation in Seversk, Tomsk Region, West Siberia. It is the first of the three facilities of the unique Generation IV Pilot Demonstration Energy Complex (PDEC), which is under construction as part of the strategic project "Proryv" (of "the Breakthrough") on site of the Siberian Chemical Combine (an enterprise of Rosatom's Fuel Division). The cutting-edge fully automated facility has already successfully manufactured the first mockup fuel bundles of the BREST-OD-300 core design with depleted uranium nitride fuel pellets. All production sites of the new facility have undergone comprehensive testing. The fuel fabrication facility includes four production sites: carbothermal synthesis of mixed uranium and plutonium nitrides, fabrication of fuel pellets, manufacturing of fuel elements, and assembly of complete fuel bundles. The staff personal of the facility will amount to 250 people. Currently, the facility operators are mastering the technology and gaining experience in fabrication of BREST-OD-300 bundles with depleted uranium fuel matrix in compliance with with the current license of Rostechnadzor (the Russian industrial and nuclear regulator). After the regulator approves handling of plutonium, the Siberian engineers will be able to start production of the target product - mixed dense nitride uranium-plutonium fuel (or the MNUP fuel), which would enable to fully implement all the advantages of Russian IV generation fuel, reactor and radiochemical technologies. Prior to the initial core loading of the BREST-OD-300, more than 200 of MNUP fuel bundles are scheduled for fabrication. Alexey Likhachev, Director General of Rosatom, commented:
Topics: NFC, Russia, BREST, Nitride fuel Other news: Turbine installation completed at Unit 1 of Akkuyu NPP The Akkuyu NPP turbine-generating unit consists of a combined high- and medium-pressure module, two low-pressure modules, and a generator. Alexey Likhachev attended the launching ceremony of Chukotka nuclear icebreaker After the launch, construction of Chukotka will proceed in the water. WANO appoints Jose Gago as its new Chair Effective on 1 March 2025. |
Hero of the day Reactor pressure vessel of Xudapu NPP Unit 4 has been installed in design position VVER-1200 reactor is a cylindrical vessel with an elliptical bottom, inside which there is the core and the internals. The length of the equipment is 13 meters, the diameter is 4.5 meters, and the weight is 320 tons. INTERVIEW
Rosatom OPINION
CNNC |