Physical startup of Ruppur-1 may occur in December - Likhachev AtomInfo.Ru, PUBLISHED 04.03.2024 The physical startup of the Ruppur NPP Unit No. 1 under construction (Bangladesh) may take place in December 2024. This, as reported by TASS, was stated by Rosatom CEO Alexei Likhachev, speaking at the World Youth Festival in Sochi. Earlier, the head of Rosatom announced that the launch of the Ruppur-1 (Bangladesh) and Kudankulam-3 (India) blocks is planned for 2024. Topics: Commissioning, Asia, Bangladesh, Opinions Other news: HTR-PM starts commercial operation It is an important pathway for optimizing energy structure, ensuring reliable energy supply, and contributing to the dual carbon goal. Lepse Floating Technical Base Dismantlement Project has been successfully implemented To discharge spent nuclear fuel, the Lepse was placed in a specially designed and built onshore sheltering site. This made it possible to prevent any weather effects. IAEA has issued a technical document on global inventories of secondary uranium supplies The document provides a comprehensive assessment of publicly available information on current secondary uranium supplies, including at the regional and national levels. |
Hero of the day Rosatom starts installation of the BREST-OD-300 4th generation reactor The steel reactor baseplate with the total weight of 165 tons has been installed. The workers have also loaded into the reactor shaft the first part of the reactor vessel - the lower tier of the containment. INTERVIEW
CNNC OPINION
WANO |