Forum   Contacts   RSS
AtomInfo.Ru


The sixth unit of Zaporizhzhya NPP is connected to the network after a fault

AtomInfo.Ru, PUBLISHED 29.12.2014

The sixth unit of the Zaporizhzhya NPP Sunday night was connected to the grid after a fault. This was reported by the press service of the station, the ITAR-TASS said.

"December 28, 2014 at 22 h 35 min the unit 6 of the Zaporizhzhya NPP is connected to the grid after a fault", the statement said.

NPP noted that "the background radiation at the site and in the sanitary protection zone is 8-12 micro-roentgen per hour, which corresponds to the natural radiation background at the location of the Zaporizhzhya NPP".

Topics: Safety, East Europe, Ukraine


Other news:

Rostov-3 is connected to the grid

The work on the fourth unit construction goes as scheduled.

Vermont Yankee closure will negatively affect the economy of the region

The plant will be closed at the end of December.

TEPCO has unloaded all assemblies from spent fuel pool of Fukushima Daiichi-4

The unloading was launched on November 18, 2013 and ended on 22 December 2014.


Hero of the day

AtomInfo.Ru

From abacus to TOPAZ

All equipment fitted into the four self-propelled track-type platforms. On one of those was placed a reactor, on the second - control unit, on the third - heat exchanger, and on the forth, the last one - turbine.



INTERVIEW

Lev Kochetkov

Lev Kochetkov
Whether at once appeared sodium coolant in Russian fast reactors, or sodium has had rivals? What types of fuel have been regarded as a fuel for the fast reactor program, and do we need such a high BG?


OPINION

Falling Wednesday

Falling Wednesday
Start of the third block of Olkiluoto NPP is already delayed by more than five years, and the delay will only increase.


Search:


Rambler's Top100