Rosatom CEO Alexey Likhachev held talks with chairman of the China Atomic Energy Authority AtomInfo.Ru, PUBLISHED 15.12.2023 In accordance with the existing agreement, on December 13, 2023, Alexey Likhachev, director general of Rosatom state corporation, held talks with Zhang Kejian, chairman of China Atomic Energy Authority, at the construction site of the Xudapu NPP, located in Liaoning Province. Alexey Likhachev and Zhang Kejian discussed all the main issues of bilateral cooperation, including cooperation on the construction of power units No. 7 and No. 8 of the Tianwan NPP and power units No. 3 and No. 4 of the Xudapu NPP and the supply of equipment for the Chinese CFR-600 fast neutron demonstration reactor, as well as promising topics. Other news: HTR-PM starts commercial operation It is an important pathway for optimizing energy structure, ensuring reliable energy supply, and contributing to the dual carbon goal. Lepse Floating Technical Base Dismantlement Project has been successfully implemented To discharge spent nuclear fuel, the Lepse was placed in a specially designed and built onshore sheltering site. This made it possible to prevent any weather effects. IAEA has issued a technical document on global inventories of secondary uranium supplies The document provides a comprehensive assessment of publicly available information on current secondary uranium supplies, including at the regional and national levels. |
Hero of the day ROSATOM completed production of RITM-200 for Chukotka icebreaker This is the last reactor that the company is manufacturing under the valid contract for the supply of power units for the new generation nuclear-powered ships. After having been prepared for transportation, the reactor will be delivered to the Baltic Plant. INTERVIEW
CNNC OPINION
WANO |