![]() |
||
|
The first concrete was poured at Paks-5 AtomInfo.Ru, PUBLISHED 05.02.2026 A solemn ceremony dedicated to the start of pouring the first concrete into the foundation of the reactor building of the Paks NPP power unit No.5 (Hungary) took place on February 5, 2026. This is reported on the website of the engineering division of the Rosatom State Corporation. The VVER-1200 reactor will be installed on the unit. Topics: East Europe, Hungary, NPP Paks Other news: 412 nuclear units are operating in the world, 63 units are under construction All units of Bilibino NPP were shut down. CNNC Zhangzhou Nuclear Power Unit 2 begins operation Plant serves as starting point for large-scale deployment of Hualong Ones. Tianwan Nuclear Power Unit 7 completes hot functional test Hot functional test is conducted prior to fuel loading. |
Hero of the day
Rosatom supplies the initial load of nuclear fuel for Tianwan-7 The nuclear fuel, including the initial core load and a number of fuel assemblies supplied as reserve, was manufactured at the Novosibirsk Chemical Concentrates Plant (an enterprise of Rosatom's Fuel Division). INTERVIEW
Rosatom OPINION
CNNC |