Chinese authorities have released a plan for developing a modern energy system during the 14th Five-Year Plan period Xinhua, PUBLISHED 23.03.2022 Chinese authorities have released a plan for developing a modern energy system during the 14th Five-Year Plan period (2021-2025), setting targets for securing energy supplies and boosting energy efficiency. By 2025, China aims to bring the annual domestic energy production capacity to over 4.6 billion tonnes of standard coal, according to the plan jointly released by the National Development and Reform Commission and the National Energy Administration. The annual crude oil output will recover and stabilize at 200 million tonnes, while the annual natural gas output will reach over 230 billion cubic meters by 2025, the plan specifies. It stresses efforts to advance the large-scale and high-quality development of wind and solar power generation, and develop nuclear power in an active, safe and orderly manner. On the premise of ensuring safety, China will maintain a steady pace of construction on coastal nuclear power projects to rationally deploy new projects, the plan says, setting the goal of elevating the installed capacity of nuclear power operation to about 70 million kilowatts by 2025. While boosting energy output, the country is also seeking to reduce its carbon dioxide emissions per unit of GDP by 18 percent during the five-year period. China aims to gradually increase the share of non-fossil energy consumption to around 20 percent by 2025, and the proportion of non-fossil energy power generation will reach approximately 39 percent, according to the plan. Eyeing a significant increase in energy efficiency, China plans to lower its energy consumption per unit of GDP by 13.5 percent during the 2021-2025 period. Other news: Ghana will decide on the site before the end of the year Four candidate sites are currently being explored. ROSATOM presents full Small Modular Reactors product line at EXPO 2020 Small Modular Reactors Day was an international platform for discussing the benefits of SMR. 19 CNNC nuclear power units anticipated to achieve full marks on WANO composite index Average index reaching a record high of 99.51. |
Hero of the day Fourth Hualong One unit connected to grid Unit 3 of the Karachi nuclear power plant in Pakistan was successfully connected to the gird on March 4, laying a solid foundation for its commercial operation. INTERVIEW
Vladimir Kriventsev OPINION
Victor Murogov |