Forum   Contacts   RSS
AtomInfo.Ru


Rosatom manufactures first nuclear fuel for a research reactor in Bolivia


Nuclear fuel for the initial loading of the BRR-1 research reactor, a facility under construction in Bolivia, has been manufactured and passed the acceptance tests at the Novosibirsk Chemical Concentrates Plant, an enterprise of Rosatom nuclear fuel division...


Rosatom starts afterburning of minor actinides in a fast reactor

During the scheduled refueling at the Beloyarsk NPP Unit 4, its BN-800 fast neutron reactor has been for the first time loaded with lead-test assemblies of uranium-plutonium MOX fuel also containing the so-called minor actinides, the most radiotoxic and long-lived components from irradiated nu...

Russian regulator issues the license of operation of the fuel fabrication facility for BREST-OD-300 reactor

The Federal Service for Environmental, Technological and Nuclear Supervision (Rostechnadzor) has issued a license to Siberian Chemical Combine (an enterprise of Rosatom Nuclear Fuel Division in Seversk, Tomsk Region) to operate a nuclear installation of the Unit for fabrication and refabricati...

AtomExpo-2022: electric propulsion as a new paradigm

Within the framework of the forum, round tables were organized in various areas...


TVEL unveils new fuel solutions for the Indian market

Rosatom starts supplies of nuclear fuel for CFR-600 fast reactor

TVEL will introduce new fuel and extended fuel cycle at Kudankulam NPP

Rosatom starts equipment installation at the Pilot Demonstration Energy Complex within the Proryv project

Hero of the day

WANO appoints Jose Gago as its new Chair, effective on 1 March 2025

WANO appoints Jose Gago as its new Chair, effective on 1 March 2025

He has been the President of the Spanish Nuclear Society, member of the Foro Nuclear Board of Directors and has kept close contact with the nuclear industry serving at several advisory boards and participating in the International Atomic Energy Agency (IAEA) expert missions.



INTERVIEW

Rosatom

Rosatom
Pietro Barabaschi held a meeting with the management of the Institute and saw around the facilities for high-tech components manufacturing of the future plant.


OPINION

AtomInfo.Ru

AtomInfo.Ru
The global nuclear energy industry has reached a landmark milestone. According to the PRIS database maintained by the IAEA, the total number of reactor years of operation of nuclear power units in the world has exceeded 20 thousand.


Search: